A Reality Check on ‘Renewable Energy' and “Unobtanium”



If You Want ‘Renewable Energy,’ Get Ready to Dig

Excerpt:

“Renewable energy” is a misnomer. Wind and solar machines and batteries are built from nonrenewable materials. And they wear out. Old equipment must be decommissioned, generating millions of tons of waste. The International Renewable Energy Agency calculates that solar goals for 2050 consistent with the Paris Accords will result in old-panel disposal constituting more than double the tonnage of all today’s global plastic waste. Consider some other sobering numbers:

A single electric-car battery weighs about 1,000 pounds. Fabricating one requires digging up, moving and processing more than 500,000 pounds of raw materials somewhere on the planet. The alternative? Use gasoline and extract one-tenth as much total tonnage to deliver the same number of vehicle-miles over the battery’s seven-year life.

When electricity comes from wind or solar machines, every unit of energy produced, or mile traveled, requires far more materials and land than fossil fuels. That physical reality is literally visible: A wind or solar farm stretching to the horizon can be replaced by a handful of gas-fired turbines, each no bigger than a tractor-trailer.

Building one wind turbine requires 900 tons of steel, 2,500 tons of concrete and 45 tons of nonrecyclable plastic. Solar power requires even more cement, steel and glass—not to mention other metals. Global silver and indium mining will jump 250% and 1,200% respectively over the next couple of decades to provide the materials necessary to build the number of solar panels, the International Energy Agency forecasts. World demand for rare-earth elements—which aren’t rare but are rarely mined in America—will rise 300% to 1,000% by 2050 to meet the Paris green goals. If electric vehicles replace conventional cars, demand for cobalt and lithium, will rise more than 20-fold. That doesn’t count batteries to back up wind and solar grids. ...

The demand for minerals likely won’t be met by mines in Europe or the U.S. Instead, much of the mining will take place in nations with oppressive labor practices. The Democratic Republic of the Congo produces 70% of the world’s raw cobalt, and China controls 90% of cobalt refining. The Sydney-based Institute for a Sustainable Future cautions that a global “gold” rush for minerals could take miners into “some remote wilderness areas [that] have maintained high biodiversity because they haven’t yet been disturbed.”

What’s more, mining and fabrication require the consumption of hydrocarbons. Building enough wind turbines to supply half the world’s electricity would require nearly two billion tons of coal to produce the concrete and steel, along with two billion barrels of oil to make the composite blades. More than 90% of the world’s solar panels are built in Asia on coal-heavy electric grids.

Engineers joke about discovering “unobtanium,” a magical energy-producing element that appears out of nowhere, requires no land, weighs nothing, and emits nothing. Absent the realization of that impossible dream, hydrocarbons remain a far better alternative than today’s green dreams.


Comment: Kind of like Flubber - The discovery of it portrayed by the Absent Minded Professor

10.19.2011

The world's first megawatt-size wind turbine

Oct. 19, 1941: Electric Turbines Get First Wind

Excerpt:

The American windmill, as it was called, was simple and Western and rugged. Its shape hardly changed after key 1880s experiments by Thomas Perry resulted in the founding of the Aermotor company, which dominated the industry thereafter.

But that’s not the kind of turbine that Putnam had in mind. After looking into the designs of the past, he immediately decided that the economics of scale dictated that he build a wind turbine with 75-foot blades, the largest in the world. It would generate more than a megawatt of power and feed it on to the grid, working in tandem with a hydroelectric plant to even out the intermittency of the wind and the seasonality of water generation.

No one had ever pulled off that balancing act before, and most people working in the wind industry were probably too sane to try.

It’s important to understand how ridiculously grand the project really was. Its scale — 10 times as powerful as the very largest turbine and a thousand times more powerful than most of them — was almost unimaginable.

...

“Vermont’s mountain winds were harnessed last week to generate electricity for its homes and factories,” read the Sept. 8, 1941, issue of Time, jumping the gun a bit. “Slowly, like the movements of an awakening giant, two stainless-steel vanes — the size and shape of a bomber’s wings — began to rotate.”

The turbine ran through hundreds of hours of testing up to 1943, often pumping power onto the Central Vermont Public Service Corporation’s electrical grid. The project’s engineers were sure that, technically, the machine worked.

The Smith-Putnam wind turbine stood as a testament to the power of human — and American — ingenuity. A decade before, Soviet engineers had built the world’s largest wind turbine, a 100-kilowatt machine. Now the Yanks had constructed their own, 10 times more powerful.

Time concluded its article on the project with a hopeful half-prediction, “New England ranges may someday rival Holland as a land of windmills.” This was, after all, merely the prototype for whole lines of turbines that would be more resistant to German bombs than a centralized coal plant.

...

At exactly 3:10 a.m. on March 26, 1945, after more than 1,100 hours of operation, the Smith-Putnam turbine experienced an epic failure. One of the turbine’s blades broke clean off and went sailing 750 feet through the night.